2nd floor gutted
Day by Day, House Renovations June 14th, 2008

All of the walls, wiring, electrical fixures, plumbing – everything was gutted from the second floor. All that’s left is the chimney, and a bathtub made of marble that is almost impossible to move because of the weight.

Lee has blogged
168 times to Thinking Out Loud
